brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Answer this question, me and my partner have no idea what to do I'm very confused
An order to appear at a particular time and place and bring specified documents
At the Atkins County Fair, the crowd for a concert by The Cooper Band cannot exceed a certain number. The limit for the number of people who can attend the conc
Sweet treats pays a constant annual dividend of $2.38 a share and currently sells for $52.60 a share. what is the rate of return?
please help on b (left of c) and c !!! rewrite each of the following expressions so that your answer has no negative or fractional exponents
What is the area of a regular pentagon with a side length of 10 inches and a distance from the center to a vertex of 10 inches? Round your answer to the nearest
11 POINTS GUYS PLZ Answer 12 and 14
In which quadrant is sin positive and tan positive?
Which one of the following is NOT a cause of acid precipitation? a. sulfur dioxide from burning coal b. nitrogen oxides from car exhaust c. destruction of th
A model rocket is launched with an initial upward velocity of 67/ms. The rocket's height h (in meters) after t seconds is given by the following. h= 67t-5t^2 F