henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

any notable feature of an organism is called
why are many ecological phenomena difficult to study
How do the actions of earthworms improve soil quality? How does this impact the amount of biomass an ecosystem can support?
Which words make up the adverb phrase in this sentence? In colonial days, there were no fire departments. A. fire departments B. In colonial days C. there w
change 12.39% to a decimal
Find the area of an equilateral triangle (regular 3-gon) with the given measurement in terms with a radical. 6-inch side. A = sq. in.
A die of unknown bias is rolled 20 times, and the number 3 comes up 6 times. In the next three rounds (the die is rolled 20 times in each round), the number 3 c
What equals 168 in multiplication
how to divide 25.0 divided by 29.4
Why did Egyptians build pyramids?