when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

Is it possible to list all of the multiples of 12? Explain
A word for the ending of a story in which things are wrapped up
what is the relationship between spain and england?
What is the analogous position in a state government?
A company sells cookies in 250-gram packs. When a particular batch of 1,000 packs was weighed, the mean weight per pack was 255 grams and the standard deviation
Democracy was first practiced in which part of the world?
sue stacked one box onto another the bottom box had height of 2 1/3 top had 3 2/3 feet how tall were the stacked boxes
what is .645 converted into a fraction in simplest form
what is 4/5x-3 3/4 x=2 1/2
Sperm are released out of the male reproductive system through the (2 points)