  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

If f(x) is 4x-3 what is (f^-1of) (10)
The Habsburg Empire did all of the following EXCEPT A. take control of Hungary, Croatia, and Slovonia. B. lose their Holy Roman Empire in Germany. C. remain a c
what is force ?is it desirable or undesirable?
can u tell me how to solve this promblem 4/7 plus 3/7
I just need the equation on how to do it. I'm so lost :'( help please!!!!!!
wats the 60% off a prize that is $20.00
You shoot an arrow set a target. The parabolic path of the arrow passes through the points shown in table. X. Y 30. 6 60. 7 100. 4 A. Find a quadratic function
The Habsburg Empire did all of the following EXCEPT A. take control of Hungary, Croatia, and Slovonia. B. lose their Holy Roman Empire in Germany. C. remain a c
What are the characteristics of mass culture?
take 2 identical bowls filled with water.shine a spotlight on one and place one away from the spotlight in the same room. which shows higher evaporation and why