leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

did the columbian exchange bring more changes to the Americas or to Europe
integer equation carl owed his mom $27
In which climate zone is the Sahel located? (1 point) a.arid b.semi-arid c.tropical wet d.tropical wet and dry
Which planet has very large dust storms
6 divided by four sevenths
(S^2 +r^2)^2 Please show me how you got the answer.
Which of these steps might happen after a bill is sent to the president? The president can veto the bill. The president can send it to committee. The presiden
my number has 2 hundreds the tens digit is 9 more than the ones digit
What does it mean to write a word problem for anExpression tHat is three times as great as (15+7) Then write the expression
Why were Europeans interested in exploration in the fifteenth and sixteenth centuries?