A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the answer to 17=5k-2
How are the circulatory systems in animals and plants alike? A. All plants and animals have a heart. B. Their circulatory systems move blood throughout the orga
One tank is filling at a rate of 5/8 gallon per 7/10 hour. A second tank is filling at a rate of 5/9 gallon per 2/3 hour. Which tank is filling faster? WHY? WHY
By the end of the Civil War, A. the Confederate states had been admitted back into the Union. B. African Americans had gained full citizenship. C. the South’s e
What stone faced animal was all the rage in 1970?
x^2-9x+8 what is the Factor to this problem
Lysosomes can be compared to the recycling and garbage centers of a city. How can this comparison be justified? A; They break down their own membranes and diges
Which set of points lies on the given graph? A. (5, 13), (1, 1), (2, –1) B. (5, 13), (–1, 1), (2, 1) C. (–5, 13), (1, 1), (2, –1) D. (–5, 13), (1, 1), (2, 1
Fact and Opinion Direction: Read each statement and then circle whether it is a fact or opinion.Explain your answer. 1-The fastest land dwelling creature is t
what is the definition of inherent power