goeln1260 goeln1260
  • 01-07-2020
  • Physics
contestada

give relation between potential work and time​

Respuesta :

mfonudo
mfonudo mfonudo
  • 04-07-2020

Relation between work done and potential is a change in the potential energy associated with the force. The negative sign provides the convention that work done against a force field increases potential energy, while work done by the force field decreases potential energy.

Answer Link

Otras preguntas

What is biogeography and what does it provide?
5x+4y+100 in slope intercept form
Find all powers of 4 in range 4 through 1,000
Alicia estimates that the surface area of a rectangular prism with a length of 11 meters,a width of 5.6 meters,and a height of 7.2 meters is about 334 cubic met
What is biogeography and what does it provide?
Why was is difficult for the Arab people to form one nation?
The value square root of 53 of lies between which two consecutive integers?
Can somoene help me with this question??How might the history of the U.S. have been different if the original thirteen states had been guaranteed a perpetual ma
If Walt can paint 25 feet of fence in an hour, and Joe can paint 35 feet in an hour, how many minutes will it take them to paint a 150-foot fence, if they work
If a slope of a line is 2/0 is it 0 or undefined?