23gantaak
23gantaak 23gantaak
  • 04-04-2019
  • Mathematics
contestada

BRAINLIEST ANSWER: Two workers finished a job in 7.5 days. How long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

Respuesta :

akeel5
akeel5 akeel5
  • 04-04-2019

Answer:

first we must times 7.5 into 8 to find out what the answer is,

the answer is 60

Answer Link

Otras preguntas

According to Yale Professor Craig Wright, what is a faun
The owner of the toy store receives a shipment of 1552 party favors. The party favors came and 28 boxes the same number of party favors were in 27 of the boxes.
The equation y = mx + b is in ___-____ form. (2 words)
How do you do this?
how much its 5+3+3×15=
On this day in 1879, albert einstein was born in what city and country? at what u.s. college did he teach?
How does import of proteins with mitocondrial import sequences affect zfns, talens, and cas9?
how does this simplification misrepresent what takes place during the process of photosynthesis
What is evolution that occurs as a result of chance events?
One tank of goldfish is feed once a day, a second tank twice a day, and a third tank four times a day during a six-week study. the fishes' body fat is recorded.