dannyd2310
dannyd2310 dannyd2310
  • 02-04-2019
  • Computers and Technology
contestada

Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Find all powers of 4 in range 4 through 1,000
The length of a diagonal of a cube with edge length 25cm
If 8 men can chop down 28 trees in one day, how many trees can 20 men chop down in one day?
5x+4y+100 in slope intercept form
How do scientists use seismic waves to determine the interior structure of Earth?
5x+4y+100 in slope intercept form
The height of a rectangular prism with a 20 cm by 12 cm base and a 30 cm diagonal.find the unknown dimension
Dominick lives 1 3/4 miles from his school.  If his mother drives him half the way, how far will Dominick have to walk to get to school?
which factor made the most difference in how agriculture affected the economies of the colonies?
which factor made the most difference in how agriculture affected the economies of the colonies?